Description
FIELDS OF USE
It can be used as between floors as screed insulation.
SURFACE PREPARATION
The application surface floor covering, must be cleaned from dust first. Prevent adhesion materials such as paint and oil should be cleaned and the preparation should be completed.
APPLICATION
Consistently prepared floor screed is applied in a single layer with a steel trowel or plaster pump on a slightly damp surface and gauge is applied. No foreign material should be added to the prepared mixture. (Lime, Gypsum, Cement etc.)
APPLICATION DETAILS
In manual application, it should be mixed with an average of 8-10 liters of water with a low speed drill for 3-4 minutes, poured onto the floor and allowed to dry. In machine application, it should be pumped to the surface by mixing with an average of 8-10 liters of water. When the desired thickness is reached, it should be allowed to dry.
APPLICATION CONDITIONS
Application surface and ambient temperature should be above 5 °C. Considering excessive moisture loss at temperatures above 35 °C, mixing water should be increased and the surface should be kept moist by wetting for 2 days after the surface hardening phase.
ISSUES TO BE CONSIDERED
Avoid application under strong wind or sun. The time increases at low temperatures and the time decreases at high temperatures. It should not be applied on frozen, melting or freezing surfaces within 24 hours. Appropriate plaster mesh should be used at different material junctions and points where movement may be considered.
STORAGE TRANSPORT
Protect from frost, rain and other weather conditions. 70 Bags in 1 pallet is 3.500 L.
ENVIRONMENTAL IMPACTS
Not classified as dangerous.